Material Handling Projects
- MAADEN – Consultancy Services for Phosphate Company
[2013-2014, Saudi Arabia]
Upgrading of the automation system of the train unloading station.
- SABTANK/HADEED – Relocation of Substation S6 in Saudi Iron & Steel Company
[2013, Saudi Arabia]
Relocation of the existing substation to the new location, erection of a new electrical room and
installation of new switch gear. EPCM
- ALBA – Supply and Erection of Emergency Bypass Conveyor
[2013, Bahrain]
Installation of an emergency bypass conveyor system for feeding crushed butts to paste
plant 1 & 2. EPCM
- TAIMWESER – Supervision Service
[2011, Lybia]
Conpeed provided the site manager for the erection and commissioning work for a stacker/reclaimer machine.
- HADEED – Upgrading of Take-up Units, Conveyor Y30-04/05
[2009-2010, Saudi Arabia]
Upgrading of the winch take-up system.
- HADEED – Upgrading of the Oxide Material Handling System
[2006-2008, Saudi Arabia]
Port facilities (ship unloaders, conveyors) and stockyards (stackers, reloading equipment).
– Key personnel from Conpeed –
- HADEED – HYL III DRI Plant Module D
[2003, Saudi Arabia]
Engineering study and proposal for increase of production and availability including cost estimate including material handling system; project leader. – Key personnel from Conpeed –
- MANZANILLO – Gypson Loading Station
[2002, Mexico]
Complete material handling system (train/truck unloading, storage area, ship loader). – Key personnel from Conpeed –
- ALSCON – Aluminum Smelter
[1996-2005, Nigeria]
Engineering, supply and commissioning of complete material handling system, belt conveyor system, ship unloader (grab type and suction ship unloader), pneumatic conveying system; project leader. – Key personnel from Conpeed –
- TREDIR MALAYSIA – DRI Plant HYL System
[1994, Malaysia]
Engineering and supply of the complete material handling system (raw material handling and product handling); project management. – Key personnel from Conpeed –
- KRAKATAU STEEL – DRI Plant HYL System
[1994, Indonesia]
Engineering, supply and commissioning of complete material handling system, raw material handling - product handling; project management. – Key personnel from Conpeed –
- SICARTSA – HYL III DRI Plant
[1992, Mexico]
Project management, erection supervision and commissioning of module I + II including complete material handling system; technical project leader. – Key personnel from Conpeed –